History |
Matacq_laser2_3_22Nov2010.pdf Laser2 online.
Matacq_laser1_3_16Nov2010.pdf After intervention on RED laser (new lamp, TiS Q-switch mis-aligned). don't touch the Laser1 but seems better now.
Matacq_laser1_3_15Nov2010.pdf Laser1 online not ok..
Matacq_laser2_3_3Nov2010.pdf RED laser jitter much better than 29 Oct WITHOUT tuning at all !
Matacq_laser2_25 Oct.jpeg laser2 out of range; because after B field, tuning during technical stop, ect..
Matacq_laser2_3_14Oct2010.pdf Instability of the RED disappeared suddenly..!
Matacq_laser2_3_13Oct2010.pdf Same as 11 Oct.
Matacq_laser2_3_11Oct2010.pdf RED instability after quick tuning ; after new lamp 8 Oct.
Matacq_laser2_3_5Oct2010.pdf Start with Laser2.
Matacq_laser1_3_4Oct2010.pdf End of life time lamp Laser1. 1000hrs.
Matacq_laser1_3_22Sept2010 After no-handshake mode and reduce time 8sec to 4 sec for LM switching region.
Matacq_laser1_3_20Sept2010.pdf After reparation of RED laser (removing YLF chamber...)
Matacq_laser1_3_3Sept2010.pdf Normal laser sequence back, after small verification of the blue.
Matacq_laser1_3_1Sept2010.pdf Just day after tuning RED and Blue ; laser1 new flow tube.
Matacq_laser1_3_30Aug2010.pdf 1 week back to vacation. start laser1 instability. red laser restart with new lamp.
Matacq_laser1_3_22July2010.pdf Reference after maintenance.
Matacq_laser1_3_14July2010.pdf Before new lamp; maintenance
Slow_monitor_May2010.pdf Laser2 from 21 May
Slow_monitor_April2010.pdf Laser2 up to 13 April ; Laser1 online from 13 April to 21 May
Matacq_laser2_3_25May2010.pdf Not so good as in March;
Matacq_laser1_3_21April2010.pdf
Matacq_laser1_3_20April2010.pdf
Matacq_laser2_3_22Mars2010.pdf
Matacq_laser2_3_12Mars2010.pdf
Matacq_laser2_3_23Feb2010_feedback.pdf (slow monitoring here to see current evolution)